• 0

Project Consultancy, Reports & Profiles

Telangana is a state in the Southern region of India. It has an area of 114,840 km2 and is the twelfth largest state in India. Most of it was part of the princely state of Hyderabad, ruled by the Nizam of Hyderabad during the British Raj, joining the Union of India in 1948. Telangana was separated from Andhra Pradesh as a new 29th state of India, with the city of Hyderabad as its capital. Hyderabad will continue to serve as the joint capital city for Andhra Pradesh and Telangana for a period of not more than ten years. Telangana is situated on the Deccan Plateau, in the central stretch of the eastern seaboard of the Indian Peninsula. It covers 114,800 square kilometers (44,300 sq. mi). The region is drained by two major rivers, with about 79% of the Godavari River catchment area and about 69% of the Krishna River catchment area, but most of the land is arid. Telangana region has rich natural resources. About 45 per cent of the forest area in Andhra Pradesh state is in Telangana region while 20 per cent of the country's coal deposits in the country are also found here. Telangana is also rich in limestone deposits that cater to cement factories. Telangana has other mineral resources like bauxite and mica. Perennial rivers Godavari and Krishna enter Andhra Pradesh in Telangana before flowing down through other regions and ending up in the Bay of Bengal. Telangana region is sitting on potential oil and natural gas reserves, according to a report by Director General of Hydrocarbons (DGH). Telangana has a significant amount of Software export in India. While majority of the Industry is concentrated over Hyderabad, the other cities are also becoming significant IT destinations in the state. Hyderabad's IT exports exceeded $7 billion in 2014.There have been extensive investments in digital infrastructure.

 

AGRICULTURE

Rice is the major food crop and staple food of the state. Other important crops are tobacco, mango, cotton and sugar cane. Agriculture has been the chief source of income for the state's economy. Important rivers of India are the Godavari, Krishna flow through the state, providing irrigation. Telangana agriculture department separated from Andhra Pradesh as part of Andhra Pradesh bifurcation It aims promote agricultural trade and to boost up the agricultural production and productivity in the Telangana.

 

TOURISM IN TELANGANA

Telangana State Tourism Development Corporation (TSTDC) is a state government agency which promotes Tourism in Telangana. Telangana has a variety of tourist attractions including historical places, monuments, forts, water falls, forests and temples. Charminar, Golconda Fort, QutbShahi Tombs, Chowmahalla Palace, Falaknuma Palace and Bhongir Fort, are some of the monuments in the state. The Charminar, built in 1591 CE, is a monument and mosque located in Hyderabad, Telangana, India.

 

DEMOGRAPHIC PROFILE

Telangana with a population of 351.9 lakhs (according to the 2011 census) accounts for about 3.6% percent of the total population of India. Out of this, 177.0 lakhs (50.2%) are males and 174.9 lakhs (49.8%) are females. The sex ratio of the state is 988 as against the national figure of 943. The population density in the state is 307 persons/Sq.Km. In 2012-13, the services sector at Rs.  1, 14,046 crores, contributed 58.1% to the GSDP (at constant prices). It is followed by industry sector, contributing 27.9% (Rs. 54,687 crores) and the agriculture sector’s contribution of 14% (Rs. 27,450 crores). The services sector had fastest growth  of  11.31%  followed  by  industry  sector  (10.04%)  and  agriculture  sector  (6.89%) between 2004-05 and 2012-13.

The Telangana government has proposed to add 230 crore plants in the next three years under a flagship programme which envisages boosting of tree cover in the state by nearly 8%.

 

FOOD AND INDUSTRIAL PROCESSING SECTOR

The Telangana government plans to put greater emphasis on value-addition in the farm sector in its industrial policy. The departments of industry and commerce, agriculture and agro marketing would coordinate together to achieve value maximization for farmers. The government is also keen on encouraging e-marketing activities, which involves networking all agriculture mandis in the state so that farmers get access to prevailing prices across important markets and thereby helping them unlock the right value for their produce. The state in collaboration with research institutes in the country would facilitate an ideal adoption of latest practices ranging from seed technology and farm machinery to improve farm productivity. the state government is also considering specific projects such as setting up a pharmaceutical city near Hyderabad and a cotton hub in Warangal district, the largest producer of long-staple cotton. The Telangana government has begun a survey to identify land that can be offered to new industries in the state. The Telangana government is set to announce its new industrial policy under which scheduled castes and scheduled tribe entrepreneurs would be specially encouraged.

Telangana Government is mulling to set up a 'Pharma City' near the state capital in about 8,000 acres. The City will include industries as well as residential colony, and a power plant with 500 MW capacity will be set up adjacent to the pharma city to provide captive, dedicated and uninterrupted power supply to the industry. The pharma city is expected to accommodate about five lakh employees besides their families in the residential colony touching about twenty lakh over a period. Delegation of Drugs Manufacturers' Association that an international consultancy organisation with expertise in developing in the information technology and pharmaceuticals manufacturing sectors may become backbone of Telangana economy, leaving power production, ports and oil and natural gas to play a pivotal role in driving prosperity in the residuary state. Industrial estates should be contacted to design the pharma city. Telangana's per capita income of Rs 24,409 in 2004-05 has phenomenally grown to a whopping Rs 83,020. While Hyderabad has less number of households using open toilets at 0.9 per cent, Mahabubnagar is at 71.1 per cent. The land-locked state is expected to have nearly Rs 4,000 crore surplus budget, but lingering power deficit may force the new government to spend more on the power purchase. Telangana, spread in 1,14,840 square kilometres, has 66.46 per cent literacy rate with a population of 3.52 crore.

 

ECONOMY OF TELAGANA

The Economy of Telangana is mainly driven by agriculture. Two important rivers of India, the Godavari and Krishna, flow through the state, providing irrigation. Rice, cotton, mango and tobacco are the local crops. Recently, crops used for vegetable oil production such as sunflower and peanuts have gained favour. There are many multi-state irrigation projects in development, including Godavari River Basin Irrigation Projects and NagarjunaSagar Dam, the world's highest masonry dam. Telangana is a mineral-rich state, with coal reserves at SingaerniColleries. The population of Telangana is over 35 million now – much more than 30 million for the whole of Andhra Pradesh, including Telangana, at the time of its formation in 1956. The demands on governance have multiplied over this half a century. Apart from commitment to the development of the region, a smaller state being more easily accessible to the common people can intelligently and speedily grapple with their problems.

 

INDUSTRIAL POLICY FRAMEWORK FOR STATE OF TELANGANA

Industrialization will be the key strategy followed for economic growth and development for Telangana, the 29th state of the country. People of the new state have very high expectations from the Telangana State Government for creating jobs for the youth, promote development of backward areas, maximize growth opportunities by optimum utilization of the available resources, harness the talents and skills of the people etc. The Government of Telangana State realizes that industrial development requires large-scale private sector participation, with the government playing the role of a facilitator and a catalyst. The government is committed to provide a graft-free, hassle-free environment in which the entrepreneurial spirit of local, domestic and international investors will thrive to take up their industrial units in the state of Telangana as the preferred investment destination.

The new Telangana State Industrial Policy will be rooted in certain core values, as follows:

 

                • The Government regulatory framework shall facilitate industrial growth

                • Entrepreneurs will thrive in a peaceful, secure and progressive business regulatory                                        environment

                • Industrial development will lead to massive creation of jobs benefitting local youth

                • Industrialization shall be inclusive and facilitate social equality

 

The new Telangana State Industrial Policy will strive to provide a framework which will not only stabilize and make existing industries more competitive, but also attract and realize new international and national investments in the industrial sector. It is expected that the most significant outcome of this approach will be the production of high quality goods at the most competitive price, which establishes “Made in Telangana-Made in India” as a brand with high global recognition. The Industrial Policy Framework has the following mandate for departments that have any responsibility in the industrialization of the State—Minimum Inspection and Maximum Facilitation.

The Government of Telangana State is determined to create an ecosystem in which the ease of doing business in the state matches and even exceeds the best global standards. Telangana State Government is aware that offering a hassle-free system is considered to be of the highest priority by the industrialists, and accordingly the government will implement a very effective industrial clearance system that will go beyond the traditional single window system.

 

THRUST AREAS AND CORE SECTORS

•             Life Sciences including, bulk drugs, formulations, vaccines, nutraceuticals, biological,   incubation centers, R&D facilities and medical equipment.

•             IT Hardware including bio-medical devices, electronics, cellular communications.

•             Precision engineering, including aviation, aerospace, defence.

•             Food processing and nutrition products including dairy, poultry, meat and fisheries.

•             Automobiles, Transport Vehicles, Auto-components, Tractors and Farm Equipment.

•             Textiles and Apparel, Leather and leather value added products like shoes, purses, bags,         artificial   material infused and coated textiles, paper and paper products.

•             Plastics and Polymers, Chemicals and Petro-chemical, glass and ceramics.

•             FMCG and Domestic Appliances.

•             Engineering and Capital Goods, including castings, foundry and Ferro-alloys and other    metallurgical industries.

•             Waste Management and Green Technologies.

•             Renewable Energy and Solar Parks.

•             Mineral-based and wood-based Industries.

•             Transportation/Logistic Hub/Inland Port/Container Depot.

 

Telangana has emerged as a State that provides that right climate for the growth of IT business and is now one of the most preferred destinations in the Country.

The State of Telangana is poised towards creating a benchmark in Information & Communication Technology (ICT) endowed with a high quality state-of-the-art physical & communication infrastructure of international standards, harnessed human resources, and proactive business friendly policies of the Government.

It is estimated that about 20 lakh acres of land is available in the state that has been identified as unfit for cultivation in Telangana. Based on a detailed survey of these land parcels and identification of those parcels that are fit for industrial use, an industrial land bank for the State of Telangana will be developed.

The development of industrial and related infrastructure will be the responsibility of the Telangana State Industrial Infrastructure Corporation (TSIIC). The financial base of the TSIIC will be strengthened and it will be made to function as an effective organization. All lands in the State identified as fit for industrial use will be transferred to the TSIIC.

To support industrialization, the Government of Telangana will earmark 10% of water from all existing and new irrigation sources for industrial use. Water pipelines will be laid as a part of infrastructure creation for each industrial park by TSIIC. The Government of Telangana State recognizes that quality power and uninterrupted power supply are keys to the growth of the industrial sector. The State has a clear short-, medium-, and long-term plans to first overcome the power shortage and eventually become a power surplus state. Accordingly, uninterrupted power supply will be arranged in each industrial park. The Telangana State Government will encourage usage of non-conventional energy for industrial purposes.

The Telangana State Government is committed to encourage the process of industrialization by making various kinds of incentives available to the entrepreneurs. The Telangana State Government also assures an entrepreneur-friendly and graft-free regime of disbursing the incentives. The Telangana State Government will consider providing incentives to the entrepreneurs in the following areas-

•             Stamp duty reimbursement

•             Land conversion cost

•             Investment subsidy

•             VAT reimbursement

•             Interest subsidy

•             Clean production measures

•             Reimbursement of infrastructure development costs etc.

A sound industrial policy has to ensure that the state taxation structure is conducive to industrial growth and state financial resource augmentation. Distortions in the tax structure leads to evasion of taxes and clandestine transport of industrial inputs and outputs to neighbouring states, which may have advantageous tax rates. The presence of important national and state highways, coupled with the availability of resources and opportunities, provides a great potential for development of industrial corridors in the state along these roadways.

The Industrial Corridors that will be developed initially will be:

 

1) Hyderabad-Warangal Industrial Corridor

2) Hyderabad-Nagpur Industrial Corridor

3) Hyderabad-Bengaluru Industrial Corridor

The new Industrial Policy brought out by the Government of Telangana promises to revolutionise the way industrial sector has been viewed by successive governments in this country. A day is not far when the new Industrial Policy of Telangana will shine as an exemplar among the best in the world.


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Baby Cereal Food
Baby Cereal Food

The Baby-cereal-foods is that enriched food which has a requisite level of nutrition. This requisite level is prescribed... Read More

Capacity :
600,000 Kgs/annum
Plant and Machinery cost:
35.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
72.00 %
TCI :
0.00 Lakhs
Cost of Project :
82.00Lakhs
Add To Inquiry Basket
Potato Flakes and Pellets
Potato Flakes and Pellets

Indian vegetable basket is incomplete without mentioning the king of vegetables-potato-a sustaining force and a culinary... Read More

Capacity :
Potato Flakes : 600 MT/annum Potato Pellets : 600 MT/annum
Plant and Machinery cost:
140.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
401.00Lakhs
Add To Inquiry Basket
Electrical Power Transformers (Repair & Refurbishment)
Electrical Power Transformers (Repair & Refurbishment)

Electrical Power Transformers (Repair & Refurbishment) 

 

Read More

Capacity :
Repairs of 25 MVA Power Transformers : 60 Nos/Annum Repairs of 50 MVA Power Transformers: 36 Nos/Ann
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
200.00Lakhs
Add To Inquiry Basket
Essential Oil Extraction (Jasmine and Tuberose)
Essential Oil Extraction (Jasmine and Tuberose)

Essential oils, also called volatile odoriferous oil, are aromatic oily liquids extracted from different parts of plants, f... Read More

Capacity :
Jasmine Oil (5 ml Size Pack) : 750Ltrs/annum Tuberose Oil (5 ml Size Pack): 750Ltrs/annum
Plant and Machinery cost:
18.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
42.00Lakhs
Add To Inquiry Basket
Phenolic Foam
Phenolic Foam

Phenolic foam is a dense, lightweight and porous material that can be cut into virtually any shape. It holds its shape when... Read More

Capacity :
3,600,000 Pcs/annum
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
270.00Lakhs
Add To Inquiry Basket
Mango Pickles
Mango Pickles

Pickle is a general term used for fruits or vegetables preserved in vinegar or brine, usually with spices or sugar or both.... Read More

Capacity :
1,500,000 kgs/annum
Plant and Machinery cost:
50.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
253.00Lakhs
Add To Inquiry Basket
Wood Plastic Composite (WPC)
Wood Plastic Composite (WPC)

Wood-plastic composites (WPCs) are a product class that has been developing over the last 40 years resulting in increased applications and expanded... Read More

Capacity :
4800000 sq.ft.
Plant and Machinery cost:
146.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
391.00Lakhs
Add To Inquiry Basket
Floral Foam
Floral Foam

Floral foam is a dense, lightweight and porous material that can be cut into virtually any shape. It holds its shape when w... Read More

Capacity :
3,600,000 Pcs/annum
Plant and Machinery cost:
69.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
270.00Lakhs
Add To Inquiry Basket
Spices and Masala  Grinding, Blending and Packing
Spices and Masala Grinding, Blending and Packing

Spices are non-leafy parts (e.g. bud, fruit, seed, bark, rhizome, and bulb) of plants used as a flavoring or seasoning, alt... Read More

Capacity :
Chole Masala : 400,000 Kgs/annum Sambhar Masala: 400,000 Kgs/annum Garm Masala : 400,000 Kgs/annum
Plant and Machinery cost:
91.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
32.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
1004.00Lakhs
Add To Inquiry Basket
Precast RCC Sleeper  for  Railway Track
Precast RCC Sleeper for Railway Track

Earlier, wooden sleepers were used for laying the railway tracks but due to the depleting wooden resources and increasing c... Read More

Capacity :
120,000 Pcs/annum
Plant and Machinery cost:
1509.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
39.00 %
TCI :
0.00 Lakhs
Cost of Project :
1970.00Lakhs
Add To Inquiry Basket
Hydroponic Green House Farming
Hydroponic Green House Farming

Hydroponics is a system of agriculture that utilizes nutrient-laden water rather than soil for plant nourishment. The re-us... Read More

Capacity :
Tomatoes: 500 MT/annum Peas: 45MT/annum Cucumber: 70MT/annum
Plant and Machinery cost:
22.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
188.00Lakhs
Add To Inquiry Basket
Precipitated Silica  from Rice Husk Ash
Precipitated Silica from Rice Husk Ash

Rice milling generates a byproduct known as husk. This surrounds the paddy grain. During milling of paddy about 78 % of weight is r... Read More

Capacity :
Precipitated Silica : 1200mt/annum Activated Carbon (by product) : 336mt/annum Sodium Carbonate
Plant and Machinery cost:
556.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
1200.00Lakhs
Add To Inquiry Basket
Sheet Metal Components for Automobiles
Sheet Metal Components for Automobiles

Sheet metal is simply metal formed into thin and flat pieces. It is one of the fundamental forms used in metal working, and... Read More

Capacity :
Auto Sheet Metal Components : 600MT/Annum Metal Scraps : 6MT/Annum
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
176.00Lakhs
Add To Inquiry Basket
Paper Cups, Plates and Boxes
Paper Cups, Plates and Boxes

Paper cups and glasses are made in a variety of sizes and shapes according to the amount of material to be filled. They are... Read More

Capacity :
Paper Cups : 18,720,00 Pcs/annum Paper Plates : 21,600,000 Pcs/annum Corrugated Boxes : 1
Plant and Machinery cost:
46.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
292.00Lakhs
Add To Inquiry Basket
Sweat Free and Antibacterial Socks
Sweat Free and Antibacterial Socks

A sock is an item of clothing worn on the feet and often covering the ankle or some part of the calf. The foot is among the... Read More

Capacity :
450,000 Pairs/annum
Plant and Machinery cost:
42.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
66.00 %
TCI :
0.00 Lakhs
Cost of Project :
161.00Lakhs
Add To Inquiry Basket
Hydroponic Green House Farming
Hydroponic Green House Farming

Hydroponics is a system of agriculture that utilizes nutrient-laden water rather than soil for plant nourishment. The re-... Read More

Capacity :
Tomatoes: 800 MT/annum Peas: 36 MT/annum Cucumber : 56 MT/annum Beans : 80 MT/annum
Plant and Machinery cost:
23.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
489.00Lakhs
Add To Inquiry Basket
Soft Gelatin Capsules
Soft Gelatin Capsules

Soft gelatin (also called softgel or soft elastic) capsules consist of one piece hermetically-sealed soft shells. Soft gela... Read More

Capacity :
1,800,000 Th.Nos./annum
Plant and Machinery cost:
261.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
478.00Lakhs
Add To Inquiry Basket
Paper Cups, Plates and Boxes
Paper Cups, Plates and Boxes

Paper cups and glasses are made in a variety of sizes and shapes according to the amount of material to be filled. They are... Read More

Capacity :
Paper Cups : 18,720,00 Pcs/annum Paper Plates : 21,600,000 Pcs/annum Corrugated Boxes : 1
Plant and Machinery cost:
46.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
292.00Lakhs
Add To Inquiry Basket
Vitamin ‘C’
Vitamin ‘C’

Vitamin C is a physiological antioxidant of major importance for protection against diseases and degenerative processes caused by... Read More

Capacity :
2400 MT/annum
Plant and Machinery cost:
123.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
563.00Lakhs
Add To Inquiry Basket
Aloe Vera Gel and Powder
Aloe Vera Gel and Powder

Aloe Vera Gel is one of the product prepared from aloe vera itself. Aloe vera Gel has very good medicine for external us... Read More

Capacity :
Aloevera Gel : 90,000 Kgs/annum Aloevera Powder : 15,000 Kgs/annum
Plant and Machinery cost:
42.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
164.00Lakhs
Add To Inquiry Basket
Repair & Refurbishment of Power Transformers
Repair & Refurbishment of Power Transformers

Transformer is a machine that transfers electrical energy from one electrical circuit to another without changing frequency by the principle of ele... Read More

Capacity :
Repairs of 25 MVA Power Transformers : 60 Nos/Annum Repairs of 50 MVA Power Transformers: 36 Nos/Ann
Plant and Machinery cost:
33.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
65.00 %
TCI :
200.00 Lakhs
Cost of Project :
200.00Lakhs
Add To Inquiry Basket
Industrial Safety Leather Shoes
Industrial Safety Leather Shoes

An Industrial Safety Leather Shoes steel-toe boot is a durable boot or shoe that has a protective reinforcement in the toe which protects the foot ... Read More

Capacity :
300,000 Pairs/Annum
Plant and Machinery cost:
90.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
73.00 %
TCI :
359.00 Lakhs
Cost of Project :
359.00Lakhs
Add To Inquiry Basket
Fruit Pulp ,Mango, Guava, Pomegranate, Papaya
Fruit Pulp ,Mango, Guava, Pomegranate, Papaya

Fruit pulp is prepared from selected varieties of fruits. Fully matured fruits are harvested and quickly transported to the fruit processing plant.... Read More

Capacity :
Mango Pulp : 1200 MT/Annum Guava Pulp: 1200 MT/Annum Pomegranate Pulp: 1200 MT/Annum Papaya Pulp: 12
Plant and Machinery cost:
66.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
70.00 %
TCI :
379.00 Lakhs
Cost of Project :
379.00Lakhs
Add To Inquiry Basket
Virgin Coconut Oil
Virgin Coconut Oil

Virgin coconut oil (VCO) is the pure... Read More

Capacity :
Virgin Coconut Oil (Packed in 1 Ltr Glass Bottle): 90,000Ltrs/Annum
Plant and Machinery cost:
63.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
21.00%
Break Even Point (BEP):
61.00 %
TCI :
195.00 Lakhs
Cost of Project :
195.00Lakhs
Add To Inquiry Basket
Atta, Maida, Suji& Wheat Bran (Roller Flour Mill)
Atta, Maida, Suji& Wheat Bran (Roller Flour Mill)

Around 800 large Flour Mills in the ... Read More

Capacity :
Maida: 16500 MT/annum Sooji : 9900 MT/annum Wheat Flour: 41400 MT/annum Bran: 14700 MT/annum
Plant and Machinery cost:
1648.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
2660.00 Lakhs
Cost of Project :
2660.00Lakhs
Add To Inquiry Basket
Fulvic Acid
Fulvic Acid

Fulvic acid is a part of the humic s... Read More

Capacity :
1200MT/Annum
Plant and Machinery cost:
42.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
42.00 %
TCI :
160.00 Lakhs
Cost of Project :
160.00Lakhs
Add To Inquiry Basket
NAMKEEN (DALMOTTH, BHUJIA, CHANA CHUR, KHATTA MEETHA)
NAMKEEN (DALMOTTH, BHUJIA, CHANA CHUR, KHATTA MEETHA)

Dal Moth, Chanachur,Bhujia and khatt... Read More

Capacity :
300 Tonn/Annum
Plant and Machinery cost:
8.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
62.00 %
TCI :
81.00 Lakhs
Cost of Project :
81.00Lakhs
Add To Inquiry Basket
Jeans Manufacturing Unit
Jeans Manufacturing Unit

Jeans are trousers, a type of garment... Read More

Capacity :
Readymede Garment (Jeans) : 120,000 Pcs/Annum
Plant and Machinery cost:
35.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
48.00 %
TCI :
415.00 Lakhs
Cost of Project :
415.00Lakhs
Add To Inquiry Basket
Medium Density Fiberboard (MDF)
Medium Density Fiberboard (MDF)

Fiberboard is a type of engineered wo... Read More

Capacity :
15,000CBM/annum
Plant and Machinery cost:
1213.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
55.00 %
TCI :
2050.00 Lakhs
Cost of Project :
2050.00Lakhs
Add To Inquiry Basket
Thermocol Plates, Cups, Bowls and Glasses
Thermocol Plates, Cups, Bowls and Glasses

 

Read More

Capacity :
Thermocol Cups: 30,000 Th.Pcs/Annum Thermocol Glasses : 30,000 Th.Pcs/Annum Thermocol Plates: 100000
Plant and Machinery cost:
461.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
51.00 %
TCI :
717.00 Lakhs
Cost of Project :
717.00Lakhs
Add To Inquiry Basket
Herbal Wine
Herbal Wine

Wine is an alcoholic beverage made f... Read More

Capacity :
Herbal Wine (750 ml Size Bottle): 800,000 Nos/annum
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
65.00 %
TCI :
334.00 Lakhs
Cost of Project :
334.00Lakhs
Add To Inquiry Basket
Paracetamol
Paracetamol

Paracetamol, also known as acetamino... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Roller Flour Mill
Roller Flour Mill

Around 800 large F... Read More

Capacity :
Maida: 22,500 MT/annum Sooji: 5,400 MT/annum Wheat Flour : 9000 MT/annum Bran
Plant and Machinery cost:
2085.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
2899.00 Lakhs
Cost of Project :
2899.00Lakhs
Add To Inquiry Basket
Canvas Shoes
Canvas Shoes

Footwear refers to garments worn on ... Read More

Capacity :
Canvas Shoes:1200,000 pairs/annum Leather Shoes:900,000 pairs/annum
Plant and Machinery cost:
607.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
64.00 %
TCI :
1006.00 Lakhs
Cost of Project :
1006.00Lakhs
Add To Inquiry Basket
Integrated Unit Cold Storage with Food Processing
Integrated Unit Cold Storage with Food Processing

Cold storage is a system for holding produce in an atmosphere that differs substantially from normal air in respect to CO2 and O2 levels. The gas m... Read More

Capacity :
Mango Pulp (200 Kgs Size Drum Pack) : 10,000 Packs/Annum Mango Jelly (10 Kgs Size Poly Pack): 25,000
Plant and Machinery cost:
500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
54.00 %
TCI :
1749.00 Lakhs
Cost of Project :
1749.00Lakhs
Add To Inquiry Basket
Blood Bags
Blood Bags

Blood bag is a disposable bio-medical device used for collection, storage, transportation and transfusion of human blood and blood components. The ... Read More

Capacity :
10000 Nos./Day
Plant and Machinery cost:
176.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.24%
Break Even Point (BEP):
69.15 %
TCI :
1106.00 Lakhs
Cost of Project :
1106.00Lakhs
Add To Inquiry Basket
Distribution Transformer
Distribution Transformer

A distribution transformer is a transformer that provides the final voltage transformation in the electric power distribution system, stepping down... Read More

Capacity :
2000 Nos./Annum
Plant and Machinery cost:
44.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
67.00 %
TCI :
391.00 Lakhs
Cost of Project :
391.00Lakhs
Add To Inquiry Basket
Health Drink (Cocoa Beverages in Granules Form)
Health Drink (Cocoa Beverages in Granules Form)

The health food drink market in India is approx. 300,000 MT per annum and is growing at the rate of around 15% per annum. T... Read More

Capacity :
Health Drink (Cocoa Beverages) : 30 MT/Day
Plant and Machinery cost:
284.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.54%
Break Even Point (BEP):
55.85 %
TCI :
1024.00 Lakhs
Cost of Project :
1024.00Lakhs
Add To Inquiry Basket
Production Unit of Liquid Washing Soap, Perfumed Bleach for the Wash of White Cloths, Toilet Tills Hard Stains Remover Liquid , Detergent Powder
Production Unit of Liquid Washing Soap, Perfumed Bleach for the Wash of White Cloths, Toilet Tills Hard Stains Remover Liquid , Detergent Powder

Production Unit of Liquid Washing Soap, Perfumed Bleach for the Wash of White Cloths, Toi... Read More

Capacity :
Detergent Powder:3.2 MT/day•Liquid Washing Soap:3.2 MT/day •Toilet Cleaner:3.2 MT/day •Perfumed Blea
Plant and Machinery cost:
72.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
74.00 %
TCI :
210.00 Lakhs
Cost of Project :
210.00Lakhs
Add To Inquiry Basket
Citric Acid
Citric Acid

Citric acid is described as “nature's acidulant”, occurring in a wide variety of plants, citrus fruits, animal tissues, micro-organisms... Read More

Capacity :
100 MT/Day
Plant and Machinery cost:
14950.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
12.04%
Break Even Point (BEP):
44.33 %
TCI :
18350.00 Lakhs
Cost of Project :
18350.00Lakhs
Add To Inquiry Basket
ENZYME (Alkaline Protease ,Amylase ,Cellulase, Laccase)
ENZYME (Alkaline Protease ,Amylase ,Cellulase, Laccase)

Enzymes are macromolecular biological catalysts. Enzymes accelerate, or catalyze, chemical reactions. The molecules at the beginning of the process... Read More

Capacity :
Alkaline Protease 1MT/Day •Amylase 1MT/Day •Cellulase 1MT/Day •Laccase 1MT/Day
Plant and Machinery cost:
5693.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.32 %
TCI :
14825.00 Lakhs
Cost of Project :
14825.00Lakhs
Add To Inquiry Basket
Plastic Optical Lenses
Plastic Optical Lenses

Optical Lenses are optical components designed to focus or diverge light. Optical Lenses, which may consist of a single or multiple elements, are u... Read More

Capacity :
60,000 Pairs/Day
Plant and Machinery cost:
1026.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
45.00 %
TCI :
2211.00 Lakhs
Cost of Project :
2211.00Lakhs
Add To Inquiry Basket
SOLAR PANEL
SOLAR PANEL

Solar Panels are in general Silicon ... Read More

Capacity :
Solar PV Module (240 watt) : 350 Nos/day (25 MW)
Plant and Machinery cost:
278.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
852.00 Lakhs
Cost of Project :
852.00Lakhs
Add To Inquiry Basket
PET RECYCLING
PET RECYCLING

Polyethylene terephthalate or PET (also known as PETE) is one of the most common types of plastic. Most single-serve plastic bottles, including tho... Read More

Capacity :
Recycled PET Granules : 12MT/day
Plant and Machinery cost:
189.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
513.00Lakhs
Add To Inquiry Basket
Vacuum Fried Vegetable Chips (Sweet Potato, Beans and Beetroot)
Vacuum Fried Vegetable Chips (Sweet Potato, Beans and Beetroot)

India is one of the largest producers of potato. Besides being used as a daily food item in various vegetable preparations, potato today increasing... Read More

Capacity :
Sweet potato: 120 kg/day Beat root: 80 kg/day Beans chips: 266 kg/day
Plant and Machinery cost:
83.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
209.00Lakhs
Add To Inquiry Basket
Aluminium Foil
Aluminium Foil

Aluminium plays a major role in the modern world through its innumerable forms of applications- from kitchen ware to electric conductors and from r... Read More

Capacity :
6 MT/Day
Plant and Machinery cost:
312.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
312.00Lakhs
Add To Inquiry Basket
Particle Board (Wood Base)
Particle Board (Wood Base)

Particle Boards are a relatively new type of engineered wood product.It is cheaper, denser and more uniform than conventional wood and plywood. The... Read More

Capacity :
600Nos/day
Plant and Machinery cost:
452.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
54.00 %
TCI :
1066.00 Lakhs
Cost of Project :
1066.00Lakhs
Add To Inquiry Basket
High Tensile Wire Used in Prestressed Concrete Poles and Railway Sleepers
High Tensile Wire Used in Prestressed Concrete Poles and Railway Sleepers

High tensile wires are those which can withstand great strain without breaking or becoming deformed. High tensile wire is made with higher carbon s... Read More

Capacity :
60 MT/day
Plant and Machinery cost:
224.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
58.00 %
TCI :
958.00 Lakhs
Cost of Project :
958.00Lakhs
Add To Inquiry Basket
MIG Welding Wire
MIG Welding Wire

MIG ... Read More

Capacity :
MIG Welding Wire : 12000 MT/annum
Plant and Machinery cost:
921.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
56.00 %
TCI :
2052.00 Lakhs
Cost of Project :
2052.00Lakhs
Add To Inquiry Basket
Aluminium Foil
Aluminium Foil

Aluminium plays a major role in the m... Read More

Capacity :
Household, Food Packaging: 3,000 MT/Annum Grade Aluminium Foil Pharmaceutical Grade Printed : 1,500
Plant and Machinery cost:
1340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
60.00 %
TCI :
2717.00 Lakhs
Cost of Project :
2717.00Lakhs
Add To Inquiry Basket
Virgin Coconut Oil
Virgin Coconut Oil

The coconut is the most extensively g... Read More

Capacity :
720 MT/Annum
Plant and Machinery cost:
15.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
171.00 Lakhs
Cost of Project :
171.00Lakhs
Add To Inquiry Basket
PVC Membrane for Waterproofing
PVC Membrane for Waterproofing

The sheet of polyvinyl chloride is used as waterproof barrier in construction for all types of roofs, terraces, walls also in civil engineering in ... Read More

Capacity :
PVC Membrane (2 mm Thickness):3,333 SQM/Day
Plant and Machinery cost:
238.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.76%
Break Even Point (BEP):
57.50 %
TCI :
469.00 Lakhs
Cost of Project :
469.00Lakhs
Add To Inquiry Basket
Sanitary Napkins
Sanitary Napkins

A sanitary napkin or a sanitary towe... Read More

Capacity :
18000 Packets/Day
Plant and Machinery cost:
99.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.32%
Break Even Point (BEP):
45.69 %
TCI :
321.00 Lakhs
Cost of Project :
321.00Lakhs
Add To Inquiry Basket
IV Fluid and Dialysis Solution
IV Fluid and Dialysis Solution

Intravenous therapy IV therapy is th... Read More

Capacity :
IV Fluid NS5 (500 ml Size):8,000 Bottles/Day •IV Fluid DNS (500 ml Size): 8,000 Bottles/Day •IV Flui
Plant and Machinery cost:
315.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.41%
Break Even Point (BEP):
43.11 %
TCI :
1151.00 Lakhs
Cost of Project :
1151.00Lakhs
Add To Inquiry Basket
Export House
Export House

Export means taking goods out of India to a place outside India.” Export trade in India is regulated by the Directorate General of Foreign Tr... Read More

Capacity :
Fruits – Apple 800.0 Kgs/Day•Banana 600 Kgs/Day •Mango 600 Kgs/Day •Grapes 400 Kgs/Day •Pomogranates
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.98%
Break Even Point (BEP):
59.05 %
TCI :
697.00 Lakhs
Cost of Project :
697.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Castor Oil from Castor Se... Castor Oil: 5 MT / Day Castor De-Oiled Cake: 7.2 MT / Day 29.00 374.00
Surgical & N95 Mask Manuf... Surgical Face Masks (each Pkts = 25 Pcs.): 576 Pkts / Day N95 Face Masks (each Pkts = 5 Pcs.): 2,880 28.00 717.00
Earthmover JCB Bucket Pin... JCB Bucket Pin 42 mm Diameter : 1,666.7 Kgs / Day JCB Bucket Pin Bush : 1,666.7 Kgs / Day JCB Bucke 27.00 418.00
Urea Fertilizer- Start Bu... Urea Fertilizer: 972.2 MT / Day 27.00 15110.00
Manufacturing of Gum Arab... Arabic Gum (Talha): 6.73 MT / Day 26.00 535.00
Poly-lactic Acid (PLA) - ... Polylactic Acid (PLA): 100 Ton / Day 26.00 30838.00
Eco-Friendly Bamboo Based... 0 0.00 0.00
Business Ideas in Product... 0 0.00 0.00
Production of Woven PP Ce... PP Woven Sacks (for Cement Bag 50 Kgs Size):258000 Nos/ day PP Woven Jumboo Sacks (for Cement Bag 15 14.00 891.00
Vitamin ‘C’ Manufacturing... 600 kg/day 24.00 717.00
Start A Single Wall Steel... 2,000 Nos/ day 29.00 439.00
Invest in Linear Alkyl Be... 0 0.00 0.00
Weaving of Fiberglass Fab... 0 0.00 0.00
Business opportunities in... Maize Starch: 30 MT per day Liquid Glucose: 30 MT per day Gluten: 4.50 MT per day Germs: 6 MT per d 21.00 4496.00
Emerging business opportu... 1.0 MT per Day 27.00 165.00
Business Ideas and Invest... 0 0.00 0.00
Most Profitable Manufactu... 0 0.00 0.00
Best Manufacturing Busine... 0 0.00 0.00
Dal Mill, Split Pulses, R... 0 0.00 0.00
Start a Production Unit o... 0 0.00 0.00
How to Manufacture the En... 0 0.00 0.00
Best Profitable Manufactu... 0 0.00 0.00
How to set up a Chocolate... Milk Chocolate:1,600 Kgs Per Day Dark Chocolate:1,600 Kgs Per Day White Chocolate:1,600 Kgs Per Day 29.00 671.00
Set up a Unit of Carbon B... 167 MT per day 49.00 8249.00
Profitable Business Idea ... 0 0.00 0.00
Start a Production Unit o... 0 0.00 0.00
Business Opportunities in... 0 0.00 0.00
Set up an Manufacturing U... 0 0.00 0.00
How to Manufacture Carbon... 0 0.00 0.00
Pan Masala Sada, Meetha &... Sada Pan Masala (10 gms Size each Pouch) : 165 Kgs / Day Meetha Pan Masala (4 gms Size each Pouch): 30.00 64.00
12345678910...

Showing 1261 - 1320 of 2846 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR